ARCHIVED BRIDGE DESIGN STANDARDS
(BDs) |
Std. Dwg. No. |
Standard
Title |
Date |
Sheet
Title(s) |
No. of Shts. |
-- |
Transmittal Letters & Revision
Description |
|
|
5 |
Jan. 21, 2003 |
|
5 |
April 15, 2004 |
|
3 |
July 29, 2005 |
|
4 |
July 24, 2006 |
|
3 |
Dec. 15, 2006 |
|
2 |
July 20 2007 |
|
6 |
Dec. 29, 2008 |
|
2 |
Sept 29, 2010 |
|
8 |
Aug. 31 2012 |
|
10 |
Nov 26, 2013 |
|
4 |
Dec 15, 2014 |
|
4 |
April 29, 2016 |
|
3 |
August 4, 2017 |
|
2 |
Feb. 19, 2021 |
|
33 |
June 1, 2021 |
|
1 |
Nov. 23, 2022 |
|
6 |
BD-600M |
Index of Standards |
|
|
1 |
|
|
1 |
|
|
1 |
|
|
1 |
|
|
1 |
|
|
1 |
|
|
1 |
April 15, 2004 |
|
1 |
July 29, 2005 |
|
1 |
July 24, 2006 |
|
1 |
July 24, 2006 |
|
1 |
Dec 16, 2006 |
|
1 |
July 20, 2007 |
|
1 |
Dec 29, 2008 |
|
1 |
June 9, 2010 |
|
1 |
Sept. 20, 2010 |
|
1 |
Aug 31, 2012 |
|
1 |
Nov 26, 2013 |
|
1 |
Nov 21, 2014 |
|
1 |
April 29 2016 |
|
1 |
August 4, 2017 |
|
1 |
Feb. 19, 2021 |
|
1 |
June 1, 2021 |
|
1 |
Nov. 23, 2022 |
|
1 |
BD-601M |
Concrete Deck Slab |
|
|
1 |
|
|
7 |
|
|
7 |
|
|
7 |
Jan. 21, 2003 |
|
9 |
April 15, 2004 |
|
9 |
July 29, 2005 |
|
9 |
July 24, 2006 |
|
10 |
July 20, 2007 |
|
11 |
Sept 20, 2010 |
|
10 |
Aug 31, 2012 |
|
10 |
Nov 26, 2013 |
|
10 |
Nov 21, 2014 |
|
10 |
Apr. 29, 2016 |
|
11 |
Feb. 19, 2021 |
|
12 |
Nov. 23, 2022 |
|
12 |
BD-602M |
Sound Barrier Walls |
|
|
8 |
Jan. 21, 2003 |
|
8 |
BD-604M |
Grid Reinforced Concrete Bridge Decks |
|
|
5 |
|
|
5 |
Jan. 21, 2003 |
|
5 |
Sept. 20, 2010 |
|
5 |
Nov. 21, 2014 |
|
5 |
Apr. 29, 2016 |
|
4 |
BD-605M |
Precast Concrete Deck Panels |
|
|
6 |
Apr. 29, 2016 |
|
6 |
BD-606M |
Precast Slab Bridges & Culverts |
|
|
3 |
Jan. 21 2003 |
|
3 |
July 24, 2006 |
|
3 |
BD-609M |
PA Structure Mounted Guide Rail Barrier |
|
|
3 |
Dec 29, 2008 |
|
2 |
Sept 20, 2010 |
|
2 |
Aug, 31, 2012 |
|
1 |
Nov. 26, 2013 |
|
1 |
April 29, 2016 |
|
1 |
Aug. 4, 2017 |
|
1 |
BD-610M |
PA Bridge Barrier |
|
|
17 |
July 24, 2006 |
|
17 |
Sept. 20 2010 |
|
17 |
Nov. 21, 2014 |
|
17 |
April 29, 2016 |
|
17 |
Aug. 4, 2017 |
|
17 |
Feb. 19, 2021 |
|
10 |
BD-611M |
Concrete Diaphragm Details for Steel I-Beam Structures |
|
|
2 |
Jan. 21, 2003 |
|
2 |
July 29, 2005 |
|
2 |
July 20, 2007 |
|
3 |
Sept 20, 2010 |
|
3 |
Aug 31, 2012 |
|
3 |
Nov. 21, 2014 |
|
3 |
Apr. 29, 2016 |
|
3 |
BD-612M |
Utility Attachment to Superstructure |
|
|
3 |
Jan. 21, 2003 |
|
3 |
July 29, 2005 |
|
3 |
Sept 20, 2010 |
|
3 |
Nov. 21, 2014 |
|
3 |
Apr. 29, 2016 |
|
3 |
BD-613M |
High Load Multi-Rotational Pot Bearings |
Jan. 21, 2003 |
|
15 |
July 20, 2007 |
|
15 |
Sept. 20, 2010 |
|
15 |
Nov. 26, 2013 |
|
7 |
April 29, 2016 |
|
7 |
BD-614M |
R.C. Parapet Modifications |
|
|
3 |
BD-615M |
PA HT Bridge Barrier |
Jan. 21, 2003 |
|
3 |
July 29, 2005 |
|
3 |
Sept 20, 2010 |
|
3 |
Nov. 21, 2014 |
|
3 |
Apr. 29, 2016 |
|
3 |
BD-616M |
Field Splice |
|
|
2 |
Jan. 21, 2003 |
|
2 |
Sept. 20, 2010 |
|
2 |
April 29, 2016 |
|
2 |
BD-617M |
PA Type 10M Bridge Barrier |
|
|
18 |
July 24, 2006 |
|
18 |
July 20, 2007 |
|
18 |
Sept 20, 2010 |
|
17 |
Nov. 21, 2014 |
|
17 |
Apr. 29, 2016 |
|
16 |
Feb. 19, 2021 |
|
9 |
BD-618M |
PA Vertical Wall Bridge Barrier |
|
|
13 |
July 24, 2006 |
|
13 |
July 20, 2007 |
|
13 |
Sept 20, 2010 |
|
12 |
Nov. 21, 2014 |
|
12 |
Apr. 29, 2016 |
|
12 |
BD-619M |
Cross Frame and Solid Plate Diaphragms for Steel Bridges |
|
|
5 |
Apr. 29, 2016 |
|
5 |
BD-620M |
Steel Girder Bridges, Lateral Bracing Criteria |
April 15, 2004 |
|
6 |
Sept 20, 2010 |
|
6 |
Nov. 21, 2014 |
|
6 |
Apr. 29, 2016 |
|
6 |
Aug. 30, 2019 |
|
6 |
BD-621M |
Reinforced Concrete Abutments |
|
|
1 |
|
|
1 |
|
|
2 |
April 15, 2004 |
|
2 |
July 29, 2005 |
|
2 |
July 20, 2007 |
|
3 |
Sept 20, 2010 |
|
3 |
Aug. 31, 2012 |
|
3 |
Nov. 21, 2014 |
|
3 |
Apr. 29, 2016 |
|
3 |
BD-622M |
R.C. Abutments With Backwall Flared Wings |
|
|
2 |
|
|
5 |
Jan. 21, 2003 |
|
5 |
July 29, 2005 |
|
5 |
July 24, 2006 |
|
5 |
July 20, 2007 |
|
5 |
Sept 20, 2010 |
|
5 |
Nov. 21, 2014 |
|
5 |
Apr. 29, 2016 |
|
5 |
Feb. 19, 2021 |
|
10 |
BD-624M |
R.C. Abutments Without Backwall |
|
|
5 |
|
|
5 |
Jan. 21, 2003 |
|
5 |
July 29, 2005 |
|
5 |
July 24, 2006 |
|
5 |
July 20, 2007 |
|
5 |
Sept. 20, 2010 |
|
5 |
Apr. 29, 2016 |
|
5 |
Feb. 19, 2021 |
|
4 |
BD-625M |
Wingwall Length |
|
|
1 |
|
|
2 |
Jan. 21, 2003 |
|
1 |
Sept. 20, 2010 |
|
1 |
BD-626M |
Anchored Walls |
Aug. 31, 2012 |
|
9 |
Apr. 29, 2016 |
|
9 |
BD-627M |
Moment Slabs |
July 20, 2007 |
|
8 |
Sept 20, 2010 |
|
8 |
Aug 31, 2012 |
|
8 |
Nov. 21, 2014 |
|
8 |
Apr. 29, 2016 |
|
8 |
Feb. 19, 2021 |
|
8 |
BD-628M |
Bridge Approach Slabs |
|
|
34 |
July 20 2007 |
|
35 |
Sept. 20, 2010 |
|
35 |
Aug. 31, 2012 |
|
35 |
April 29, 2016 |
|
35 |
Aug. 4, 2017 |
|
35 |
Feb. 19, 2021 |
|
35 |
BD-629M |
Standard Reinforced Concrete Piers(Previously 659M) |
|
|
15 |
July 20, 2007 |
|
15 |
Sept. 20, 2010 |
|
15 |
Aug. 31, 2012 |
|
15 |
Nov. 26, 2013 |
|
15 |
Nov. 21, 2014 |
|
15 |
Apr. 29, 2016 |
|
15 |
Aug. 30, 2019 |
|
15 |
BD-631M |
End Wall Details |
|
|
2 |
|
|
2 |
|
|
2 |
Jan 21, 2003 |
|
2 |
July 24, 2006 |
|
2 |
Sept. 20, 2010 |
|
2 |
April 29, 2016 |
|
2 |
Aug. 4, 2017 |
|
2 |
Aug. 30, 2019 |
|
2 |
BD-632M |
R.C. Box Culvert |
|
|
8 |
|
|
8 |
|
|
8 |
Jan. 21, 2003 |
|
9 |
July 29, 2005 |
|
10 |
July 24, 2006 |
|
11 |
July 20, 2007 |
|
11 |
Dec. 29, 2008 |
|
11 |
Sept. 20, 2010 |
|
11 |
Aug. 31, 2012 |
|
15 |
Nov. 26, 2013 |
|
13 |
Nov. 21, 2014 |
|
13 |
April 29, 2016 |
|
13 |
Aug. 4, 2017 |
|
13 |
Aug. 30, 2019 |
|
15 |
Nov. 23, 2022 |
|
16 |
BD-633M |
R.C. Arch Culverts |
|
|
2 |
Dec. 29, 2000 |
|
2 |
Jan. 21, 2003 |
|
2 |
Sept. 20, 2010 |
|
2 |
Apr. 29, 2016 |
|
2 |
BD-634M |
Gabion End Walls |
|
|
1 |
Dec. 29, 2000 |
|
1 |
Jan. 21, 2003 |
|
1 |
Sept. 20, 2010 |
|
1 |
Aug. 31, 2012 |
|
1 |
BD-635M |
Design Tables for Metal Culverts |
|
|
4 |
June 30, 2000 |
| 7 |
Jan. 21, 2003 |
| 7 |
June 09, 2010 |
| 7 |
Sept. 20, 2010 |
| 7 |
BD-636M |
Reinforced Concrete Pipe |
|
|
9 |
June 30, 2000 |
|
18 |
Jan. 21, 2003 |
|
18 |
June 09, 2010 |
|
18 |
Sept 20, 2010 |
|
18 |
Nov. 26, 2013 |
|
10 |
Apr. 29, 2016 |
|
10 |
BD-637M |
Accelerated Bridge Construction – Details for Precast Rigid Frame |
|
|
6 |
BD-641M |
Overhead Sign Structures – Cantilever & Center-Mount Structures
- Strut Lengths Up to 12 192 (40') |
|
|
11 |
July 20, 2007 |
|
11 |
Sept. 20, 2010 |
|
8 |
Aug. 31, 2012 |
|
8 |
Nov 26, 2013 |
|
8 |
Nov. 21, 2014 |
|
8 |
April 29, 2016 |
|
8 |
BD-642M |
Overhead Sign Structures – Tapered Tube Structures Spans From
9 144 to 24 384 (30’ – 80’) |
|
|
8 |
July 20, 2007 |
|
8 |
Sept. 20, 2010 |
|
6 |
Aug. 31, 2012 |
|
6 |
Nov 26, 2013 |
|
6 |
Nov 21, 2014 |
|
6 |
April 29, 2016 |
|
0 |
BD-643M |
Overhead Sign Structures – 2-Post Planar Truss Spans From
9 144 to 30 480 (30' to 100') |
|
|
18 |
Jan. 21, 2003 |
|
8 |
July 20, 2007 |
|
8 |
Sept. 20, 2010 |
|
6 |
Aug 31, 2012 |
|
6 |
Nov. 26, 2013 |
|
6 |
Nov. 21, 2014 |
|
6 |
April 29, 2016 |
|
6 |
BD-644M |
Overhead Sign Structures – 2-Post & 4-Post Tri-chord Truss
Spans From 18 288 to 73 152 (60' to 240') |
Jan. 21, 2003 |
|
21 |
July 20, 2007 |
|
21 |
Sept. 20, 2010 |
|
13 |
Aug. 31, 2012 |
|
13 |
Nov 26, 2013 |
|
13 |
Nov 21, 2014 |
|
13 |
April 29, 2016 |
|
13 |
BD-645M |
Overhead Sign Structures – 4-Post 4-chord Truss Spans From 30 480 to 60 960 (100' to 200') |
Jan. 21, 2003 |
|
10 |
Dec. 15, 2006 |
|
10 |
July 20 2007 |
|
10 |
Sept. 20, 2010 |
|
7 |
Aug. 31, 2012 |
|
7 |
Nov 26, 2013 |
|
7 |
Nov 21, 2014 |
|
7 |
April 29, 2016 |
|
7 |
BD-647M |
Monopipe Sign Structures |
Dec. 29,2008
|
4 |
|
Sept. 20, 2010 |
|
4 |
Aug. 31, 2012 |
|
4 |
Nov 26, 2013 |
|
5 |
Nov 21, 2014 |
|
5 |
April 29, 2016 |
|
5 |
BD-649M |
Dynamic Message Signs, Center-Mount Sign Structures |
Nov. 26, 2013
|
6 |
|
Nov 21, 2014 |
|
6 |
April 29, 2016 |
|
6 |
BD-650M |
Standard Dynamic Message Signs Truss Sign, Structures |
Nov. 26, 2013
|
4 |
|
Nov 21, 2014 |
|
4 |
April 29, 2016 |
|
4 |
BD-651M |
Requirements for Tendons, Dowels, Shear Block, Diaphragms, Skew Limitations and Backwalls. P/S Concrete I-Beam, PA Bulb-Tee Beam and Box Beam Bridges |
|
|
1 |
Dec. 24, 1999 |
|
2 |
Dec. 29, 2000 |
|
2 |
Jan. 21, 2003 |
|
2 |
July 29, 2005 |
|
2 |
July 20, 2007 |
|
2 |
Sept 20, 2010 |
|
2 |
Nov 26, 2013 |
|
2 |
Nov 21, 2014 |
|
2 |
April 29, 2016 |
|
2 |
BD-652M |
Beam Sizes and Section Properties |
|
|
4 |
|
|
4 |
Jan. 21, 2003 |
|
4 |
April 15, 2004 |
|
6 |
July 20, 2007 |
|
6 |
Dec. 29, 2008 |
|
3 |
Sept. 20, 2010 |
|
3 |
Aug. 31, 2012 |
|
3 |
BD-653M |
Typical Framing Plans & Details, P/S Concrete I-Beam and Spread Box Beam Bridges |
|
|
1 |
June 30, 2000 |
|
4 |
Jan. 21, 2003 |
|
2 |
July 29, 2005 |
|
2 |
July 20, 2007 |
|
2 |
Sept 20, 2010 |
|
2 |
Nov 26, 2013 |
|
2 |
Nov 21, 2014 |
|
2 |
Apr. 29, 2016 |
|
2 |
Aug. 30, 2019 |
|
2 |
BD-654M |
Standard Adjacent Box Beam Details |
Jan. 2, 1996
|
4 |
|
BD-655M |
Typical Superstructure Sections |
Jan. 2 1996 |
|
2 |
Dec. 24, 1999 |
|
2 |
July. 11, 2001 |
|
2 |
Jan. 21, 2003 |
|
2 |
July 29, 2005 |
|
2 |
July 24, 2006 |
|
2 |
July 20, 2007 |
|
2 |
Dec 29, 2008 |
|
2 |
Sept. 20, 2010 |
|
2 |
Aug. 31, 2012 |
|
2 |
Apr. 29, 2016 |
|
2 |
BD-656M |
Typical Logitudinal Sections, I-Beam and Box Beam Bridges |
|
|
3 |
June 30, 2000 |
|
4 |
July 11, 2001 |
|
4 |
Jan. 21, 2003 |
|
4 |
July 29,2005 |
|
4 |
July 24, 2006 |
|
4 |
July 20, 2007 |
|
7 |
Sept. 20, 2010 |
|
7 |
Aug. 31, 2012 |
|
7 |
Nov. 21, 2014 |
|
7 |
Apr. 29, 2016 |
|
7 |
BD-657M |
I-Beam & Box Beam Bridges |
|
|
3 |
|
|
1 |
July 24, 2006 |
|
1 |
July 20, 2007 |
|
1 |
Sept. 20, 2010 |
|
1 |
Aug. 31, 2012 |
|
1 |
BD-658M |
Shear Block Details at Pier – P/S Concrete I-Beams & Box
Beam Bridges |
|
|
1 |
Dec. 24, 1999 |
|
1 |
Jan. 21, 2003 |
|
1 |
July 29, 2005 |
|
1 |
Sept. 20, 2010 |
|
1 |
Nov. 21, 2014 |
|
1 |
BD-660M |
Deck Slab & Steel Reinforcement Placement, P/S Concrete I-Beam and Box Beam Bridges |
|
|
1 |
Dec. 24, 1999 |
|
1 |
Jan. 21, 2003 |
|
2 |
July 29,2005 |
|
2 |
July 24, 2006 |
|
2 |
Sept. 20, 2010 |
|
2 |
Nov. 21, 2014 |
|
2 |
Apr. 29, 2016 |
|
2 |
Feb. 19, 2021 |
|
2 |
BD-661M |
Box Beam Reinforcement Details, Adjacent Box Beam |
|
|
5 |
Dec. 24, 1999 |
|
5 |
Jan. 21, 2003 |
|
5 |
April 15, 2004 |
|
7 |
July 29, 2005 |
|
7 |
July 24, 2006 |
|
7 |
July 20, 2007 |
|
8 |
Sept. 20, 2010 |
|
8 |
Aug, 31, 2012 |
|
8 |
Nov. 21, 2014 |
|
8 |
Apr. 29, 2016 |
|
8 |
Feb. 19, 2021 |
|
8 |
BD-662M |
I-Beam Reinforcement Details |
|
|
1 |
Dec. 24, 1999 |
|
3 |
Dec. 29, 2000 |
|
3 |
April 15, 2004 |
|
3 |
July 29, 2005 |
|
3 |
July 24, 2006 |
|
3 |
July 20, 2007 |
|
4 |
Sept. 20, 2010 |
|
4 |
Aug. 31, 2012 |
|
4 |
Apr. 29, 2016 |
|
4 |
BD-664M |
Continuity for Live Load Details - I-Beam Bridges |
|
|
3 |
|
|
3 |
|
|
4 |
|
|
3 |
April 15, 2004 |
|
4 |
July 29, 2005 |
|
4 |
July 20, 2007 |
|
4 |
Sept. 20, 2010 |
|
4 |
Apr. 29, 2016 |
|
4 |
BD-665M |
Continuity for Live Load Details – Box Beam Bridges |
|
|
3 |
Dec. 24, 1999 |
|
3 |
Jan. 21, 2003 |
|
3 |
July 29, 2005 |
|
3 |
July 20, 2007 |
|
3 |
Sept. 20, 2010 |
|
3 |
BD-666M |
CFRP Strengthening, Prestressed Concrete Beams |
Aug. 31, 2012
|
1 |
|
Nov. 21, 2014 |
|
3 |
Apr. 29, 2016 |
|
1 |
Aug. 30, 2019 |
|
1 |
BD-667M |
Integral Abutment |
|
|
6 |
Dec. 29, 2000 |
|
10 |
Jan. 21, 2003 |
|
6 |
July 29, 2005 |
|
6 |
July 24, 2006 |
|
6 |
July 20, 2007 |
|
6 |
Sept. 20, 2010 |
|
9 |
Aug. 31, 2012 |
|
9 |
Nov 26, 2013 |
|
9 |
Nov 21, 2014 |
|
9 |
Apr. 29, 2016 |
|
9 |
Feb. 19, 2021 |
|
9 |
BD-668M |
Precast Channel Beam Bridges |
|
|
2 |
Jan. 21, 2003 |
|
2 |
Sept. 20, 2010 |
|
3 |
Aug. 31, 2012 |
|
3 |
Apr. 29, 2016 |
|
3 |
Feb. 19, 2021 |
|
3 |
BD-676M |
Ground Mounted Sound Barriers – Precast Concrete Panels |
July 29, 2005 |
|
6 |
Sept. 20, 2010 |
|
6 |
Apr. 29, 2016 |
|
6 |
BD-677M |
Ground Mounted Sound Barriers – Precast Concrete Posts |
July 29, 2005 |
|
28 |
Sept. 20, 2010 |
|
28 |
Nov. 26, 2013 |
|
20 |
Apr. 29, 2016 |
|
20 |
BD-678M |
Ground Mounted Sound Barriers – Steel Posts |
July 29, 2005 |
|
18 |
Sept 20, 2010 |
|
18 |
Nov. 21, 2014 |
|
14 |
Apr. 29, 2016 |
|
14 |
BD-679M |
Structure Mounted Sound Barrier Walls |
July 29, 2005 |
|
11 |
Sept. 20, 2010 |
|
11 |
Nov. 26, 2013 |
|
11 |
Apr. 29, 2016 |
|
11 |
BD-680M |
Offset Sound Barrier Walls |
July 29, 2005 |
|
8 |
Sept. 20, 2010 |
|
8 |
Apr. 29, 2016 |
|
8 |
BD-697M |
Geosynthetic Reinforced Soil, Intergrated Bridge System |
Nov. 26, 2013
|
4 |
|
Nov. 21, 2014 |
|
4 |
Apr. 29, 2016 |
|
4 |
Aug. 30, 2019 |
|
4 |